TY - BOOK AU - North East Electric Power Corporation Ltd. TI - Comprehensive Environmental Impact Assessment Study for MAWPHU Hydro Electric Project (85 MW), Stage-II, Meghalaya U1 - 621.311.21MAWPHU(540.17) PY - 2017/// CY - Haryana PB - Wapcos N1 - Mawphu HEP (Stage-II) comprises a concrete gravity dam, head Race Tunnel, Surge Shaft, Pressure Shaft and a surface power house on the right bank of the Umiew River. The project is proposed to utilize a net head of about 230.50 m and design discharge of 40.81 cumecs for generation of 85 MW (2X 42.5 MW). Design aspects of various civil engineering structures have been presented in this chapter. ER -