logo
North East Electric Power Corporation Ltd.

Comprehensive Environmental Impact Assessment Study for MAWPHU Hydro Electric Project (85 MW), Stage-II, Meghalaya - Haryana Wapcos 2017

Mawphu HEP (Stage-II) comprises a concrete gravity dam, head Race Tunnel, Surge Shaft, Pressure Shaft and a surface power house on the right bank of the Umiew River. The project is proposed to utilize a net head of about 230.50 m and design discharge of 40.81 cumecs for generation of 85 MW (2X 42.5 MW). Design aspects of various civil engineering structures have been presented in this chapter.

621.311.21MAWPHU(540.17) / W 17 C
Visitor Counter

, Customize and Implimented by Jivesna Tech

Powered by Koha