logo

Comprehensive Environmental Impact Assessment Study for MAWPHU Hydro Electric Project (85 MW), Stage-II, Meghalaya

By: North East Electric Power Corporation LtdMaterial type: TextTextPublication details: Haryana Wapcos 2017DDC classification: 621.311.21MAWPHU(540.17)
Tags from this library: No tags from this library for this title. Log in to add tags.
    Average rating: 0.0 (0 votes)
Item type Current library Call number Vol info Status Date due Barcode
R Series Books NIH Rorkee Library
621.311.21MAWPHU(540.17) W17C (Browse shelf (Opens below)) Volume - I Available R5660
R Series Books NIH Rorkee Library
621.311.21MAWPHU(540.17) W17C (Browse shelf (Opens below)) Volume - II Available R5661
R Series Books NIH Rorkee Library
621.311.21MAWPHU(540.17) W17C (Browse shelf (Opens below)) Volume - III Available R5662
R Series Books NIH Rorkee Library
621.311.21MAWPHU(540.17) W17C (Browse shelf (Opens below)) Volume - IV Available R5663

Mawphu HEP (Stage-II) comprises a concrete gravity dam, head Race Tunnel, Surge Shaft, Pressure Shaft and a surface power house on the right bank of the Umiew River. The project is proposed to utilize a net head of about 230.50 m and design discharge of 40.81 cumecs for generation of 85 MW (2X 42.5 MW). Design aspects of various civil engineering structures have been presented in this chapter.

There are no comments on this title.

to post a comment.
Visitor Counter

, Customize and Implimented by Jivesna Tech

Powered by Koha