Comprehensive Environmental Impact Assessment Study for MAWPHU Hydro Electric Project (85 MW), Stage-II, Meghalaya
Material type: TextPublication details: Haryana Wapcos 2017DDC classification: 621.311.21MAWPHU(540.17)Item type | Current library | Call number | Vol info | Status | Date due | Barcode |
---|---|---|---|---|---|---|
R Series Books | NIH Rorkee Library | 621.311.21MAWPHU(540.17) W17C (Browse shelf (Opens below)) | Volume - I | Available | R5660 | |
R Series Books | NIH Rorkee Library | 621.311.21MAWPHU(540.17) W17C (Browse shelf (Opens below)) | Volume - II | Available | R5661 | |
R Series Books | NIH Rorkee Library | 621.311.21MAWPHU(540.17) W17C (Browse shelf (Opens below)) | Volume - III | Available | R5662 | |
R Series Books | NIH Rorkee Library | 621.311.21MAWPHU(540.17) W17C (Browse shelf (Opens below)) | Volume - IV | Available | R5663 |
Browsing NIH Rorkee Library shelves Close shelf browser (Hides shelf browser)
Mawphu HEP (Stage-II) comprises a concrete gravity dam, head Race Tunnel, Surge Shaft, Pressure Shaft and a surface power house on the right bank of the Umiew River. The project is proposed to utilize a net head of about 230.50 m and design discharge of 40.81 cumecs for generation of 85 MW (2X 42.5 MW). Design aspects of various civil engineering structures have been presented in this chapter.
There are no comments on this title.